Redevelopment of Zwierzyniecka Footbridge in Wrocław
The redevelopment of Zwierzyniecka footbridge in Wrocław was executed for the Commune of Wrocław, in the name and on behalf of which the Roads and City Management Authority in Wrocław acts. The contract scope comprised the redevelopment of the exit road and repair of the footbridge.
Scope of works performed:
- Task no. 1: “Redevelopment of the Northern Exit Road from Zwierzyniecka Footbridge in Wrocław”
- Bridge works,
- Roadworks,
- Electrical works,
- Landscape structures,
- Vegetation,
- Installation, maintenance and dismounting of the diverted traffic arrangement, including material reclaiming, signage maintenance,
- Installation and maintenance of the target traffic arrangement, including material reclaiming, signage maintenance,
- Arrangement, maintenance and liquidation of the site facilities, including electricity and water supply,
- Protection of the horizontal control network,
- Development of the schedule of works and expenditures based on the accepted design of the diverted traffic arrangement
- Task no. 2: “Repair of Zwierzyniecka Footbridge in Wrocław”
- Bridge works,
- Roadworks,
- Electrical works,
- Installation, maintenance and dismounting of the diverted traffic arrangement, including material reclaiming, signage maintenance,
- Arrangement, maintenance and liquidation of the site facilities, including electricity and water supply,
- Protection of the horizontal control network, Repair of Zwierzyniecka Footbridge in Wrocław:
- Development of the schedule of works and expenditures based on the accepted design of the diverted traffic arrangement
Localisation:
Wrocław
Client:
Zarząd Dróg i Utrzymania Miasta we Wrocławiu
Value:
3,5 mln
Realisation time:
9 months