RSS

RSS
20181108_151657.jpg
20181110_104421.jpg
20181110_104740.jpg
IMG_20181207_092431.jpg
20181116_070424.jpg
20181120_145614.jpg
20181122_074327.jpg
20181122_074614.jpg
DSC_4811.JPG
DSC_4770.JPG
DSC_4769.JPG
DSC_4822.JPG
DSC_4992.JPG
DSC_5044.JPG
20190905_103525.jpg
IMG_20190905_101140.jpg
IMG_20190905_101409.jpg
IMG_20190905_101636.jpg
IMG_20190905_101709.jpg
IMG_20190905_103906.jpg
IMG_20190905_103909.jpg
IMG_20200131_101358.jpg
IMG_20200131_101337.jpg

Redevelopment of the Bridge over the Vistula River in Puławy in the Voivodeship Road no. 874 Zarzecze – Puławy (former communal road no. 112801L)

INTOP Warszawa sp. z o.o. as the consortium Leader and EURO-DARMAL sp z o.o. implement the task called:

Redevelopment of the Bridge over the Vistula River in Puławy in the Voivodeship Road no. 874 Zarzecze – Puławy (former communal road no. 112801L)

This redevelopment will comprise replacement of the sidewalk structure made from steel plate and the bitumen pavement with composite panels to reduce the structure load. The replacement will be carried out in two stages. Replacement of the sidewalk from the Upstream will be completed in 2018, while the one from the Downstream in 2019.

The redevelopment will comprise also:

— corrosion protection of steel structures,

— replacement of the damaged rivets with the high strength friction grip bolts,

— replacement of shoulder barriers with new ones,

— repair of supports,

— replacement of the electrical grid suspension,

— replacement of the telecommunications network suspension,

— repair of the drainage system,

— repair of inspection trolleys.

Localisation: Puławy
Client: ZDW Lublin
Value: 16 mln
Realisation time: 27 months