Redevelopment of the Bridge in Chociebuska Street in Wrocław

Intop Warszawa performed the redevelopment of the bridge in Chociebuska Street in Wrocław.

The bridge takes Chociebuska Street over

  • a two-track electrified main railway line no. 275 from Wrocław Muchobór – Gubinek,
  • Station track no. 70 in Wrocław Nowy Dwór station,
  • a two-track electrified railway line no. 759 from Wrocław Gądów to Wrocław Nowy Dwór,
  • a single-track electrified railway line no. 751 from Wrocław Gądów to Wrocław Zachodni.

The scope of this task comprised:

  • Demolition of the existing engineering structure, i.e. the bridge over the PKP tracks,
  • Construction of a new engineering structure, i.e. the bridge over the PKP tracks to replace the existing bridge designed for demolition,
  • Extension of the access road from the north in Chociebuska Street,
  • Extension of the access road from the south in Chociebuska Street,
  • Redevelopment of Żernicka Street in the required scope,
  • Construction of the bridge drainage system (construction of the stormwater system network, including the stormwater discharge to the existing stormwater system)
  • Construction of municipal service ducts (MTKK),
  • Redevelopment of the existing street lighting,
  • Diversion of the existing stormwater system kd 200 managed by PKP PLK in Wrocław,
  • Diversion of the existing telecommunications system,
  • Felling trees and shrubs, cultivating vegetation.
Localisation: Wrocław
Client: Wrocławskie Inwestycje
Value: 7,3 mln
Realisation time: 10 months