Modernisation of 14 Engineering Structures, Including Redevelopment of Haul Roads at Idzikowice – Opoczno Płd. Route

As a result of the tender won and the contract signed on 7 January 2019, the consortium composed of Intop Warszawa Sp. z o.o. (Leader) and Serso Sp. z o.o., in the procedure to award a public procurement to a consortium, will carry out the modernisation of 14 engineering structures, including the redevelopment of haul roads at Idzikowice – Opoczno Płd. route under the project called “Modernisation of Railway Line no. 4 Central Railway Main Line, stage 2” executed pursuant to the Public Procurement Act.

The subject of this contract is the modernisation of 14 structures based on the documents submitted by the Contracting Entity as well as the design and redevelopment of haul roads along the railway line no. 4 at Idzikowice – Opoczno Płd. route, with the engineering structures, haul road, drainage and felling of trees and shrubs.

Localisation: Idzikowice - Opoczno
Client: PKP Polskie Linie Kolejowe S.A.
Value: 44,9 mln
Realisation time: 22 months