Extension of the National Road no. 74, Including Engineering Structures in Kuźnica Strobińska

On 18 March 2020, we signed the contract for the “Extension of the National Road no. 74, Including Engineering Structures in Kuźnica Strobińska”.

 

The task comprises:

— extension of the national road no. 74 at the section of ≈93.60 m (length of the section with two engineering structures);

— demolition of the existing bridge and construction of a road embankment in its place;

— demolition of the existing bridge and construction of a new bridge over the Wierznica river;

— redevelopment of the accompanying infrastructure.

The building works will be executed using the partial closure method, ensuring continuous vehicle traffic along one road lane.

Localisation: Kuźnica Strobińska
Client: GDDKiA
Value: 6 mln
Realisation time: 8 months