Extension of J. Piłsudski Roadbridge in Toruń
Under the contract, the contractor will be obliged to broaden the sidewalk supports which the pedestrian and bicycle paths rest on to 4.2 m which will enable to separate the pedestrian and bicycle traffic on the bridge on either side of it. The contractor will also repair the existing bridge slab. The structure will receive new components, including sidewalk slabs, road and sidewalk pavement, drainage, lighting, illumination and guardrails.
This investment comprises corrosion protection of the existing and newly-designed steel structure, construction of vantage points, building a descent to Kępa Bazarowa and a new descent to Bulwar Filadelfijski with lifts for cyclists and people of limited mobility. We will also e.g. clean and repair stone cladding, bridge abutments and supports, redevelop the networks on the structure and the technical infrastructure conflicting with the designed investment.
During the first stage of works, the bridge surface will be repaired and the components above the road will be cleaned and coated. During stage 2 of J. Piłsudski road bridge repair, there is a sidewalk repair and any works required below the bridge are planned.