RSS

RSS
IMG_20180818_050404.jpg
IMG_20181118_004216 (2).jpg
IMG_20181124_004629.jpg
3.jpg
7.jpg
6.jpg
5.jpg
4.jpg
2.jpg
8.jpg
1.jpg
IMG_20190730_005805.jpg
IMG_20190801_225312.jpg
IMG_20190906_104302.jpg
IMG_20191105_151508.jpg
IMG_20191105_154534.jpg
IMG_20200103_105955.jpg
IMG_20200227_120705.jpg
IMG_20200311_221419.jpg
IMG_20200311_224715.jpg
IMG_20200312_015759.jpg
IMG_20200318_135454.jpg
IMG_20200325_153252.jpg
IMG_20200325_153723.jpg
IMG_20210422_104924.jpg
IMG_20210422_105050.jpg
IMG_20210422_105139.jpg
IMG_20210422_105825.jpg
IMG_20210316_145133.jpg
IMG_20210316_145432.jpg
IMG_20210422_113652.jpg
IMG_20210422_114020.jpg
IMG_20210422_104650.jpg
IMG_20210422_105655.jpg
IMG_20210329_152115.jpg

Design and Execution of Building Works in Rzeszów Główny Station

On 12 June 2018, the contract was signed for the design and execution of building works at Rzeszów Główny station. The development will be carried out under the project called “Improved Technical Condition of the Passenger Infrastructure (including Adaptation to the TSI PRM requirements), Stage 3 Rzeszów Główny”. The total contract value is PLN 205 million. The contract deadline is 34 months.

The consortium composed of Track Tec Construction Sp. z o.o., Intop Warszawa Sp. z o.o., Infrakol Sp. z o.o. Sp. k., and Inżynieria Rzeszów S.A. will execute works concerning the railway surface, substructure, engineering structures, level crossing and overhead catenary system.

The station will receive three higher and more functional platforms, waiting canopies and benches. The train timetable will be displayed on displays and given in the form of voice announcements.

Lifts and escalators will promote circulation in the station with its clear signage. The functional layout will be extended with a new passage under the track.

There are plans to replace tracks, overhead catenary system and railroad traffic control devices.

In Rzeszów, there will be one bridge redeveloped at Batorego Street and three over Aleja Wyzwolenia. The reinforcement and widening of the structure at Batorego Street will offer more efficient and safer circulation of trains. The road traffic will improve significantly. The safety level at the railway line in Rzeszów will be increased greatly by the street redevelopment and the installation of new devices at the level crossing at Marii Konopnickiej Street.

Construction of a new stop, Rzeszów Zachodni, was planned within this development. It will be equipped with canopies, benches, bike stands and passenger information facilities. This will be beneficial for people with limited mobility as there is a lift and ramp planed at the platforms.

Localisation: Rzeszów
Client: PKP Polskie Linie Kolejowe S.A.
Value: 205 mln
Realisation time: 34 months