RSS

RSS
DSC06457.JPG
DSC06460.JPG
IMG_20190618_163147.jpg
DSC00016.JPG
DSC00027.JPG
DSC00034.JPG
DSC00070.JPG
DSC00182.JPG
DSC00188.JPG
DSC00206.JPG
DSC00237.JPG
IMG_20190724_163808.jpg
IMG_20190808_165538.jpg
IMG_20190813_120040.jpg
IMG_20190819_073902.jpg
IMG_20190905_164707.jpg
IMG_20200129_101135.jpg
IMG_20200129_101201.jpg
IMG_20200129_104510.jpg
IMG_20200129_105152.jpg
IMG_20200129_105427.jpg
DSC01034.JPG
DSC01046.JPG
DSC01049.JPG
DSC01276.JPG
DSC01385.JPG
DSC01529.JPG
DSC01579.JPG
DSC01835.JPG
DSC01840.JPG
DSC01844.JPG
DSC01837.JPG
DSC01867.JPG
DSC01919.JPG
DSC01966.JPG
DSC02077.JPG
DSC02111.JPG
DSC02199.JPG
IMG_20210114_090646.jpg
IMG_20210114_091400.jpg
IMG_20210114_091647.jpg
IMG_20210114_091735.jpg
IMG_20210114_091842.jpg
IMG_20210114_091933.jpg
IMG_20210114_092043.jpg
IMG_20210114_092357.jpg
IMG_20210114_092609.jpg

Construction of a Bridge over PKP Line, Including the Construction and Extension of the Voivodeship Road no. 674 in Sokółka and the Required Technical Infrastructure

Intop Warszawa Sp. z o.o. Started the task called “Construction of a Bridge over PKP Line, Including the Construction and Extension of the Voivodeship Road no. 674 in Sokółka and the Required Technical Infrastructure”.  The major objective of this investment is the construction of a bridge over the railway line which will facilitate traffic on the voivodeship road no. 674 Sokółka – Krynki. The basic bridge parameters:

— a 3-span bridge with the total length of: 142.60 m,

— span length: 42.0+58.0+42.0 m

— total width: 16.28 m,

— width of the road on the structure: 8.8m,

 

Report on the Construction of the Bridge in Sokółka Shot by Twoja Telewizja Regionalna

 

To the right of the carriageway on the bridge, there will be a sidewalk made 2.0 m wide and to the left of it a pedestrian and cycling path 3.5 m wide.

On the access road to the structure, there will be retaining walls built in the reinforced soil technology, aimed at raising the road gradeline above the gauge of the crossed railway line.

The task will cover also the redevelopment of

Kryńska Street from the junction with Wodna Street to the junction with Nowa Street

and Mariańska Street from the junction with Grodzieńska Street to the junction with Kolejowa Street.

Localisation: Sokółka
Client: Podlaski Zarząd Dróg Wojewódzkich
Value: 49,9 mln
Realisation time: 26 months