EN
|
PL
Realisations - Intop Warszawa
Menu
About us
Realisations
Contact
Right menu
Realisations
Print
RSS
RSS
In progress
Extension of J. Piłsudski Roadbridge in Toruń
Completed
Extension of the National Road no. 74, Including Engineering Structures in Kuźnica Strobińska
Completed
Modernisation of 16 engineering structures at Pilichowice – Olszamowice route” under the project called “Modernisation of Railway Line no. 4 Central Railway Main Line, stage 2”
In progress
Revitalisation of the Railway Line no. 57 at Kuźnica Białostocka – Geniusze (S) section and Revitalisation of the Railway Line no. 923 at Bufałowo Wschód – Bufałowo (S) section
Completed
Construction of Two-level Crossroads (Road Bridge) over the Railway Line no. 4 Grodzisk Mazowiecki – Zawiercie and Liquidation of the Level Crossing in km: 95.136
Completed
Design and execution of building works to implement the projects called: “Revitalisation of the Railway Line no. 59 at the Polish Border – Chryzanów (S) Section” and “Investment Works at the Border Crossing Siemianówka – Swisłocz Section
Completed
Construction of a Bridge over PKP Line, Including the Construction and Extension of the Voivodeship Road no. 674 in Sokółka and the Required Technical Infrastructure
Completed
Modernisation of 14 Engineering Structures, Including Redevelopment of Haul Roads at Idzikowice – Opoczno Płd. Route
In progress
Maintenance of the Engineering Structures in Warsaw
Completed
Building Works on Gdański Bridge in Warsaw
previous
1
2
3
4
next